Technologies >Photonics > Runschedule

  Europractice SiPhotonics MPW runs, Schedule 2018

 
      

imec-ePIXfab SiPhotonics

2017

2018

2019

N

D

J

F

M

A

M

J

J

A

S

O

N

D

J

F

imec-ePIXfab SiPhotonics: passives

 

 

 

 

27

 

 

 

 

28

 

 

 

 

 

 

imec-ePIXfab SiPhotonics: iSiPP50G

 

 

 

6

 

 

15

 

 

 

 

16

 

 

 

 

 
* iSiPP50G = advanced passives + Modulator + Detector + LPASS + M2 + edge coupler
                                 
The dates mentioned in the table above for imec-SiPhotonics are registration deadlines (RD).

To allow for a smooth tape-in, all imec-SiPhotonics designs have to go through a weekly checkpoint in the weeks that follow the registration deadline.

In particular, this means a first version of the design is required by RD + 0 weeks.
Europractice strives to send feedback on that design by RD +1week.
A second, corrected version of the design is required by RD+2weeks.
Feedback on the second version will be sent by RD+3weeks.
The final, DRC-clear design is expected by RD + 4weeks.
Every design that is submitted by the user should go with accompanying DRC results.

                                 

LETI-ePIXfab SiPhotonics

2017

2018

2019

N

D

J

F

M

A

M

J

J

A

S

O

N

D

J

F

LETI-ePIXfab SiPhotonics: passives

 

 

31

 

 

 

 

 

 

 

26

 

 

 

 

 

LETI-ePIXfab SiPhotonics: passives with heater

 

 

31

 

 

 

 

 

 

 

26

 

 

 

 

 

                                 

 

       

 

All rights reserved